In PANDOWAE phase 1, seven individual projects were funded by the DFG. Additionally, there were contributions from three associated projects. In PANDOWAE phase 2, projects became slightly modified, one was finished and new projects joint the research group.
Phase 2 Projects:
TROP:The impact of tropical-extratropical interactions on downstream predictability (former:ET)
RW-FCST: Diagnosing Rossby wave train errors in numerical weather forecasts (former:SESUWAT)
ADENS: Large-scale and local control of severe weather: towards adaptive ensemble forecasting
BLOCK: The predictability of blocking: Case studies using ensemble prediction
RW-GUIDE: Diagnosis and predictability of Rossby wave trains and their waveguides
Associated Project:
RW-CIRRUS: Impact of sub-synoptic scale processes in the upper troposphere on Rossby wave evolution
